Duosphere Double-Membrane Gasholders - Inspection & Maintenance
These inspection activities are undertaken each year, with the alternate year's inspection being more intrusive.
![]() |
![]() |
![]() |
|
| CLICK TO ENLARGE | CLICK TO ENLARGE | CLICK TO ENLARGE | CLICK TO ENLARGE |
Our maintenance schedule can broadly be split into two categories. A full list of our extensive maintenance schedule is available as a pdf download below
Annually |
Biennially |
||
| Confirm asset details correspond to original specification | Empty gasholder of gas from inner membrane through the flare | ||
| Electrial isolation, visual inspection and check operation of all electrical equipment | Purge gasholder in preparation of maintenance schedule | ||
| Visually check for corrosion and damage to mechanical components and fittings | Check and report for corrosion on all mechanical components | ||
| Check and report on condition of all pipework | Enter and visually inspect inner membrane for obvious damage and report | ||
| Visual inspection and report of outer and inner membrane as applicable | Check for correct location of ballast ring and target board if appropriate | ||
| Carry out small fabric repairs if required or immediately possible | Inspect staps and cables for chafing and other damage | ||
| Check and report of inner membrane anchorages and fixings | Check satisfactory operation of all valves and actuators, fixed and hand | ||
| Vusually inspect security of u/s transducer and cable | Operate system valves so that upper gas operational level is reached | ||
| Check air damper valve for smooth operation, and proper pressure settings | Simulate an inner membrane leak and check alarm is raised | ||
| Lubricate and sdjust settings of mechanical gas PRV | Check condition of lightning conductor system and associated cabling | ||
| Visually inspect and report on all earthing arrangements | Check compound is secure and free of foilage, weeds and other debris | ||
| Thoroughly clean all external components and enclosures, check paintwork | Ensure remedial actions confirm to M & E 3039 | ||
| Pleas email us for our complete maintenance schedules | |||